Contents

On-call schedules

A schedule answers one question: who is on call right now? It lives under Observer, On-call. Each schedule has a time zone and one or more layers, and you can put anyone in the workspace on it.

On-call schedules are opt in per workspace while they roll out: they need the logs.onCall flag and an e-volv Observer subscription. Creating, editing or deleting a schedule, and rotating its calendar URL, needs the admin role. Any editor can add an override.

Rotations

A layer rotates through its members in the order you pick them. There are three kinds of rotation:

  • Daily: one member per day, handing over at the handoff time.
  • Weekly: one member per week, handing over on the handoff day at the handoff time, for example 09:00 Monday.
  • Every N hours: turns of a fixed length, from 1 to 672 hours, back to back from the start.

Handoff times are read in the schedule's time zone, so a 09:00 Monday handoff stays at 09:00 Monday when the clocks change. The week that contains a daylight saving change is an hour shorter or longer, with no gap and no one on call twice. The first member is on call from the handoff on the start date, and nobody is on call before it.

Layers and restrictions

Layers stack, and a later layer wins wherever it has someone on call. A layer can be restricted to certain hours: days of the week plus a from and to time. Outside its hours the layer steps aside and the layer under it takes over. A window whose end is earlier than its start runs past midnight.

A common shape is a weekly base layer for the whole team, with a second layer restricted to weekdays 09:00 to 17:00 for daytime cover. If no layer has anyone at a given moment, that stretch is a gap with nobody on call, and the timeline shows it empty.

If someone leaves the workspace, their turns pass to the next member of the layer until you edit the schedule.

Overrides

An override puts one workspace member on call for a window, over every layer, for a swap, a sick day or a holiday. Outside its window the schedule is unchanged. An override must end after it starts. Where two overrides overlap, the newer one wins.

The timeline

A schedule's page shows the next 14 days with one row per layer and one for overrides. Each row shows only the shifts that layer actually covers, so reading down the rows tells you who will really be paged. Hover a shift for its exact start and end in the schedule's time zone.

Calendar feed

Every schedule has an iCal URL with the next 60 days of shifts, one event per shift. Subscribe to it in Google Calendar (Other calendars, From URL) or Outlook (Add calendar, Subscribe from web), and the calendar keeps itself up to date. Each shift keeps the same event id when the feed is regenerated, so an edit moves the event rather than duplicating it.

url
https://api.e-volv.io/api/public/v1/oncall/<token>.ics

The URL needs no login: the 32-byte token in it is the secret, so treat it like a password. Rotate URL on the schedule page issues a new one and the old one stops working at once. The feed answers 404 when the token is unknown, when the workspace turns the flag off, or when the Observer subscription lapses.

Escalation policies

A schedule says who is on call. An escalation policy says who is paged when an incident opens, and who next if nobody answers. Policies live under Observer, On-call, Escalation policies. A policy is a list of levels. Each level names schedules or people, the channels to page them on, and how many minutes after the incident opens it fires. Level 1 fires at once. Each later level fires at its minute mark unless someone acknowledges first. A level that pages by Push reaches the devices its people turned push on for, with an Acknowledge button on the notification; see push notifications.

Escalation is opt in per workspace while it rolls out: it needs the logs.escalation flag and an e-volv Observer subscription. Creating, editing or deleting a policy needs the admin role. Any editor can acknowledge, assign, resolve or reopen an incident.

To use a policy, choose it on an alert rule for confirmed incidents or for monitor status. The rule then hands its incident to the policy instead of sending to its own channels. Repeat runs the levels again, up to three more times, when nobody acknowledges after the last one.

When nobody is on call

A schedule with a gap, an override that has ended, or a responder who has left the workspace never pages nobody. A level whose schedules and people all resolve to no one is skipped, and the next level is paged straight away. If no remaining level reaches anyone, every workspace admin is told in-app and by email, and the timeline records it.

Acknowledge, assign, resolve

Acknowledge says you have it: escalation stops for that incident and nobody else is paged. If two people press it at once, or someone presses it in the same second the next level was due, the incident is acknowledged once and the next level is not paged. Assign names the person working on it. Resolve closes it, with an optional note on what fixed it, and Reopen starts the policy again from level 1.

A monitor going down opens an incident of its own, and the monitor recovering resolves it. While the monitor is still down, resolving its incident by hand is refused: fix the monitor first. Link a monitor to an Observer project on its form, and a monitor incident that opens within ten minutes of an open error incident in that project is merged into it, so one outage pages once.

The incident timeline

Every incident page has a timeline: when it opened, every page with who was paged and on which channel, every escalation, the acknowledgement, assignments, merges and the resolve. A channel that is not available yet in your workspace is listed as not sent, never silently dropped.

We use only essential cookies to keep you signed in and the app working. With your consent we may enable optional analytics to help us improve e-volv. See our Privacy Policy and Terms.